Deck project
Ground-level deck replacement in Downers Grove.
A sinking ground-level deck torn out and rebuilt in cedar on proper footings, with a step-down to the lawn and a built-in planter.
- Location
- Downers Grove, IL
- Project type
- Deck replacement
- Material
- Cedar
- Size
- [240] sq ft
- Build time
- [2] weeks
The challenge
A deck sinking into the lawn.
The original deck had been built on blocks sitting on the soil. After a few winters of frost heave it was uneven, the boards near the ground were rotting and water pooled against the foundation of the house.
Our solution
Real footings, airflow and a fresh cedar deck.
We removed the old deck, regraded so water runs away from the house and poured footings below the frost line. The new frame sits high enough for airflow under the boards. Cedar decking, a wide step to the lawn and a built-in planter finish it.
Materials
What it is built with.
- [01]
Western red cedar
Decking, step and planter
[Brand]
- [02]
Pressure-treated lumber
Ground-contact frame
[Brand]
- [03]
Concrete footings
Below the 42" frost line
—
- [04]
Joist tape
Frame protection
[Trex Protect]

BeforeAfterBefore and after
A rotting pressure-treated deck replaced with low-maintenance composite, new railings and new stairs.
- Location
- Naperville, IL
- Project
- Deck replacement
- Material
- Composite, [brand]
01/ 07
Gallery
Photos from the build.
Video
From sinking deck to solid ground.
1:24 · Filmed on site, [Month 2026]
Project videoClient review
★★★★★
Google review
“Old deck out, new deck in, in under two weeks. Clear price from day one and a spotless site every evening.”
Planning something similar?
Free on-site visit, a fixed written estimate, no obligation.