PlanningAug 30, 2026 · 6 min read

Do you need a permit for a deck in the suburbs?

What the city requires, how long it takes and what inspectors check.

AB[Author name]Founder & lead builder

Short answer: yes. Almost every village in Cook, DuPage, Kane and Will counties requires a building permit for a new deck, and most also require one to replace an existing deck. Here is what the process looks like and what inspectors actually check.

1. When you need a permit

Rules vary a little by village, but a permit is almost always required if the deck is attached to the house, more than 30 inches above grade, or larger than about 200 square feet. Replacing boards on an existing frame usually does not need one; replacing the frame or footings does.

  • New deck of any size attached to the house
  • Any deck more than 30" above the ground
  • Replacing the frame, posts or footings
  • Adding a roof, pergola or hot tub to a deck

2. What you submit

A typical application includes a plat of survey showing where the deck goes, a framing plan with joist sizes and spans, footing details and a railing and stair detail. Some villages also want a site plan showing setbacks from property lines.

Footing holes ready for inspection, Downers Grove, IL.
Footing holes ready for inspection, Downers Grove, IL.

3. How long it takes

StepTypical time
Drawings and application3–5 days
Village plan review1–4 weeks
HOA approval (if any)2–6 weeks, often in parallel
Inspections during the buildFooting, framing, final

4. What inspectors check

The footing inspection happens before concrete is poured: depth below the 42" frost line, hole diameter and location. The framing inspection looks at the ledger connection to the house, flashing, joist hangers and beam size. The final checks railings, stairs, guard height and baluster spacing.

“The permit is not a formality. Most of the failing decks we tear out would never have passed a footing or ledger inspection.”

— [Author name], Standard Build

Skipping the permit can come back at you when you sell the house: buyers’ inspectors and title companies increasingly ask for permit records on decks and porches.

  • Permits
  • Planning
  • Decks
Sharefinx✉

Get a free estimate

Ready to start your deck — permit included?

We draw the plans, file with your village and meet the inspector on site. You get a fixed written estimate first.

Hours
Mon to Sat, 8am to 6pm

Get a free estimate

Thank you, there!

We received your request. A project manager will call you within one business day to book a free on-site visit.

Thank you, there!

We received your request. A project manager will call you within one business day to book a free on-site visit.